Quite often they build the house and then build the steps.
Seriously you need A draughtsman to draw the plans.Soil testing to determine footings required. Local council approval. Termite controller to lay termite barrier, chemical or physical. Plumber. Electrican. Builder. Roofer.
Ah! bugger it, just get a builder as Colleen suggested.
Seriously you need A draughtsman to draw the plans.Soil testing to determine footings required. Local council approval. Termite controller to lay termite barrier, chemical or physical. Plumber. Electrican. Builder. Roofer.
Ah! bugger it, just get a builder as Colleen suggested.
12 years ago. Rating: 0 | |
Top contributors in Uncategorized category
Unanswered Questions
https://www.akaqa.com/profile/19191636637
Answers: 0
Views: 18
Rating: 0
Winbox Malaysia | Winbox Casino | Winbox Login | Winbox One
Answers: 0
Views: 20
Rating: 0
sv368technology
Answers: 0
Views: 15
Rating: 0
what would you like?
Answers: 0
Views: 14
Rating: 0
go88vietcom
Answers: 0
Views: 14
Rating: 0
dragontiger4d
Answers: 0
Views: 13
Rating: 0
iplwinzorg
Answers: 0
Views: 13
Rating: 0
Căn hộ Global City Com Vn
> More questions...
Answers: 0
Views: 20
Rating: 0