2 Answers
The engineer was operating the mixture and prop levers and Mattenheimer was responsible link for operating the feathering button in case the engine sputtered out. Switching tanks took link about ten minutes total and until the process was completed the entire crew was preparing for the link worst.
| 5 months ago. Rating: 0 | |
Top contributors in Uncategorized category
Unanswered Questions
123b nagoya
Answers: 0
Views: 5
Rating: 0
Live Casino EV88 – Bùng Nổ Trải Nghiệm Casino Trực Tuyến Đỉnh Cao
Answers: 0
Views: 7
Rating: 0
68D
Answers: 0
Views: 15
Rating: 0
CO88
Answers: 0
Views: 13
Rating: 0
9v99
Answers: 0
Views: 18
Rating: 0
Hướng Dẫn Tham Gia Cá Cược Thể Thao Nhanh Gọn Tại FB88
Answers: 0
Views: 25
Rating: 0
Fun79 - Fun79.Sa.Com - Trang Chủ Fun79 Com Chính Thức | Nạp Đầu +200%
Answers: 0
Views: 22
Rating: 0
open88ucom6
> More questions...
Answers: 0
Views: 20
Rating: 0
vando102
Benthere
wakeleynvalentina