2 Answers
The engineer was operating the mixture and prop levers and Mattenheimer was responsible link for operating the feathering button in case the engine sputtered out. Switching tanks took link about ten minutes total and until the process was completed the entire crew was preparing for the link worst.
| 5 months ago. Rating: 0 | |
Top contributors in Uncategorized category
Unanswered Questions
ckc bet
Answers: 0
Views: 3
Rating: 0
Chơi Có Trách Nhiệm – Giá Trị Cốt Lõi Tại EV88
Answers: 0
Views: 6
Rating: 0
Meth Streams
Answers: 0
Views: 4
Rating: 0
Meth Streams
Answers: 0
Views: 4
Rating: 0
Meth Streams
Answers: 0
Views: 4
Rating: 0
Meth Streams
Answers: 0
Views: 4
Rating: 0
Meth Streams
Answers: 0
Views: 4
Rating: 0
Meth Streams
> More questions...
Answers: 0
Views: 4
Rating: 0
vando102
Benthere
wakeleynvalentina