3 Answers
You need 1.5 cu. yds. of concrete. To compute that: 120 cu. ft. divided by 1/3 ft.(4 in.=1/3 ft.)=40 cu.ft
and in 1 cu. ft. there are 27 cu. ft. so, 40 divided by 27 is 1.49 cu.yd. (so order 1.5 cu. yd.)
Do not be surprised if you cannot order less than a minimum order of perhaps 2 or 3 cu. yds. to get delivery. So if that is the case, plan on doing additional projects at the same time, build a sidewalk, etc. Do your homework, and plan accordingly!
11 years ago. Rating: 2 | |
Top contributors in Do It Yourself (DIY) category
Unanswered Questions
cwin333vip
Answers: 0
Views: 6
Rating: 0
vin777report
Answers: 0
Views: 5
Rating: 0
Khám phá sự đa dạng và uy tín tại Tydo88 - Nhà cái hàng đầu thế giới
Answers: 0
Views: 10
Rating: 0
casino trực tuyến
Answers: 0
Views: 13
Rating: 0
Trải Nghiệm Game Bài Đỉnh Nhất Tại IWIN68
Answers: 0
Views: 15
Rating: 0
kubethubnet
Answers: 0
Views: 14
Rating: 0
Đá gà trực tiếp
Answers: 0
Views: 14
Rating: 0
Phim sex Việt Nam
> More questions...
Answers: 0
Views: 15
Rating: 0