2 Answers
Take 5.0 mini indutrial crane for example. Of course, it has long list of matter needing attention. There is some ones:1. It is forbidden to operate the cranes before stretching the landing legs fully, leveling the frames and ground. 2. There must be one specially-assigned person to conduct when the crane is ready to work. 3. Pull the rope when lifting, and keep the lifting speed stable. It’s not allowed to brake or divert abruptly. It should be 0.5m higher than the obstacle when lifting horizontally. Put down the loads gently in low speed in case of dumping. 4. No one remains or walks under the lifting beam when the crane works, and keeps the beam and loads at a safe distance from the aerial cables.
9 years ago. Rating: 0 | |
Top contributors in Uncategorized category
Unanswered Questions
789WIN
Answers: 0
Views: 7
Rating: 0
789WIN
Answers: 0
Views: 5
Rating: 0
win55boats
Answers: 0
Views: 7
Rating: 0
Nhà Cái 6686
Answers: 0
Views: 5
Rating: 0
rik88bet
Answers: 0
Views: 13
Rating: 0
Nowgoal hiện đang là địa chỉ cung cấp tỷ số trực tuyến nhanh nhất Việt Nam, đến với chúng tôi người chơi sẽ có được tất cả thông tin thể thao chuẩn xác trong và người nước.
Answers: 0
Views: 18
Rating: 0
vn88bdcom
Answers: 0
Views: 12
Rating: 0
da88store?
> More questions...
Answers: 0
Views: 17
Rating: 0